McCARRAN INTERNATIONAL AIRPORT, LAS VEGAS: Demolition of 14 Inactive Properties. The project scope of work is to abate and remove all asbestos containing materials, demolish, remove and dispose all structures and footings, garages and footings, sheds, well enclosures, underground cellar, fences, walls and footings, driveways, slab on grade, patios, sidewalks, pools, etc, on fourteen (14) inactive properties as shown on the drawings. Remove all underground water lines up to the meter, remove all sewer lines up to the sewer manhole, remove irrigation system, empty and dispose all septic tanks, remove all leaching fields, demolish and cap wells, remove and dispose all air conditioning units, remove and return NV Energy meters, and remove all overhead aerial lines. Backfill and compact all open holes, trenches and pits, clear, grub and rough grade the parcels. Remove and replace sidewalk, curbs, gutter and road affected by utility removal Bids due 02/03
For details to this bid and hundreds more nationwide go to http://www.envirobidnet.com take a Free 30 day trial and then 15% discount for DF members if you subscribe (to qualify for discount use code D0246 when taking a trial)
Most Users Ever Online: 429
Currently Online:
62 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950