McCARRAN INTERNATIONAL AIRPORT: DEMOLITION OF 2 INACTIVE PROPERTIES. The project scope of work is to abate and remove all asbestos containing materials, demolish, remove and dispose all structures and footings, garages and footings, sheds, well enclosures, fences, walls and footings, driveways, slab on grade, patios, sidewalks, etc., on two (2) inactive properties as shown on the drawings. Remove all underground utilities within the property, remove all landscaping and irrigation system, empty and dispose all septic tanks, remove all leaching fields, demolish and cap wells, remove and dispose all air conditioning units, remove and return NV Energy meters and remove all overhead aerial lines. Backfill and compact all open holes, trenches and pits, clear, grub and rough grade the properties. Secure all properties with a 6' high chain link fence and swing gate
Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card needed)
Most Users Ever Online: 429
Currently Online:
61 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090