Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
Non Commissioned Officers Academy-Ft. McCoy, WI
September 26, 2005
8:36 AM
Avatar
Member
Forum Posts: 5298
Member Since:
August 29, 2005
sp_UserOfflineSmall Offline

[font=Times New Roman][size=3]The work includes construction of a Primary Leadership Development Course (PLDC) Building, an Administration Building, an Organizational Maintenance Shop (OMS) addition, construction of parking and drives, landscaping, demolition of 9 wood framed structures, related site and utility work, and incidental related work. The OMS Building Addition is a pre-engineered addition to an existing metal building and includes alteration to the existing building. The OMS building addition houses a vehicle maintenance work bay and storage areas. OMS Building addition has heating, ventilation, and electrical services, vehicle exhaust system, and an oil/water separator. Building demolition requires abatement of lead based paint and asbestos containing building materials. Meeting sustainable design goals is part of the Work. Options are A) Asphalt paving in lieu of gravel, B) Drill pad and walks west of Admin/PLDC, C) Miscellaneous electrical options, D) Building demolition, E) Sewer and water service for Phase 2, F) Bury overhead utilities along O St, G) Use ductile iron for base bid water mains, H) Use ductile iron for Option E water mains, I) Construct OMS Bldg addition/alterations and J) Additional landscaping. The project will be based on Lowest Price Technically Acceptable (LPTA) procurement. Proposals will be evaluated based on the following technical factors: Prime Contractor Construction Experience, Prime Contractor Construction Past Performance and Past Performance on Utilization of Small, Small Disadvantaged and Women-Owned Small Businesses. This solicitation is subject to the Price Evaluation Preference for HubZone Small Business Concerns. NAICS 236220. Estimated Cost Range is between $10,000,000 and $25,000,000. THIS PROJECT IS SUBJECT TO THE AVAILABILITY OF FUNDS. This project is available on compact disk only. Solicitation W912QR-05-R-0039 issue date is approximately 3 October 2005 and approximate closing date is 2 November 2005, 4:00 pm, local time. To request the CD for this project and to register as a plan holder go to Internet site http://ebs.lrl.usace.army.mil or through the District web site [/size][/font][font=Times New Roman][size=3]http://www.lrl.usace.army.mil[/size][/font][font=Times New Roman][size=3]. FTP access is through [/size][/font][font=Times New Roman][size=3]ftp://ebs.lrl.usace.army.mil/ebs/[/size][/font][font=Times New Roman][size=3]. This announcement serves as the advance notice for this project. AMENDMENTS WILL BE AVAILABLE FROM THE ABOVE WEBSITE BY DOWNLOAD ONLY.[/size][/font]

[font=Times New Roman]Point of Contact[/font]

[font=Times New Roman][size=3]Jennifer Anderson, 502-315-6176[/size][/font]

[font=Times New Roman][size=3]Email your questions to US Army Corps of Engineers, Louisville at [/size][/font][email="jennifer.j.anderson@lrl02.usace.army.mil"][font=Times New Roman][size=3]jennifer.j.anderson@lrl02.usace.army.mil[/size][/font][/email]

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
50 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19932

Posts: 28166

Administrators: JOHN: 7602, John: 6930

Skip to toolbar