Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
NM - RUIDOSO DOWNS: demolition of two existing water tanks
February 21, 2021
8:30 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

RUIDOSO DOWNS: RIVERSIDE WATERLINE AND SPRING TANK REPLACEMENT. Construction of approximately 5,800-feet of 6 to 12-inch C-900 distribution line, 130-feet of 12" HDPE, a 22" steel casing bore, appurtenances, pavement replacement to local streets, demolition of two existing tanks and construction of a new 750,000-gallon welded steel water tank, and other incidental work identified in two base bid schedules and two additive bid schedules.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
63 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar