Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
NM - Aztec: Reservoir 1 Improvements Phase 2. The Project includes the following Work: Demolition and disposal of 47,500 SF of existing concrete, demolition and disposal of
November 19, 2023
8:38 AM
Avatar
Admin
Forum Posts: 7030
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Aztec: Reservoir 1 Improvements Phase 2. The Project includes the following Work: Demolition and disposal of 47,500 SF of existing concrete, demolition and disposal of the existing outlet tower structure, re-grading the existing reservoir slopes, installation of 138,000 SF of 60 mil HDPE liner, construction of a new outlet structure and access bridge, construction of a concrete access ramp, and installation of a new 20” inlet line

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
55 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar