Aztec: Reservoir 1 Improvements Phase 2. The Project includes the following Work: Demolition and disposal of 47,500 SF of existing concrete, demolition and disposal of the existing outlet tower structure, re-grading the existing reservoir slopes, installation of 138,000 SF of 60 mil HDPE liner, construction of a new outlet structure and access bridge, construction of a concrete access ramp, and installation of a new 20” inlet line