SOMERSET COUNTY : REPLACEMENT OF COUNTY BRIDGE NO. H0802 LIVINGSTON STREET OVER VOSSELLER BROOK BOROUGH OF BOUND BROOK. This contract includes, but is not limited to, the following major items of work: Implementation of a signed detour to divert traffic during construction; Maintenance of stream flow; Establishment of soil erosion and sediment control measures; Demolition and replacement of County Bridge H0802 with precast concrete box culvert units with precast wingwall and footing units, and cast-in-place reinforced concrete parapets; Coordination with utility company for water main relocation; Approach roadway work including installation of drainage items; Removal of traffic detour and reopening roadway to traffic.
Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
47 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090