Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
NJ - MILLTOWN : DEMOLITION FOR NEW PUBLIC WORKS FACILITY
February 19, 2017
6:30 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

MILLTOWN : DEMOLITION FOR NEW PUBLIC WORKS FACILITY Demolition and complete removal of the existing warehouse structure located at 50 Washington Avenue (Block 73, Lot 2.01), including environmental remediation of asbestos and lead based paint, and utility disconnections. Upon removal of the structure, all excavation shall be backfilled and topsoil and seed shall be placed to stabilize the location. Work at additional locations may be ordered, if deemed necessary by the Mayor and Borough Council.

Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
50 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3044

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20091

Posts: 28325

Administrators: JOHN: 7602, John: 7090

Skip to toolbar