MILLTOWN : DEMOLITION FOR NEW PUBLIC WORKS FACILITY Demolition and complete removal of the existing warehouse structure located at 50 Washington Avenue (Block 73, Lot 2.01), including environmental remediation of asbestos and lead based paint, and utility disconnections. Upon removal of the structure, all excavation shall be backfilled and topsoil and seed shall be placed to stabilize the location. Work at additional locations may be ordered, if deemed necessary by the Mayor and Borough Council.