Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
NJ - Demolition of the abandoned Water Treatment Plant Building, Field Office Building
May 29, 2016
5:27 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

JACKSON TOWNSHIP MUA: Manhattan Street Complex Water Storage Improvements and Warehouse Contract. The proposed work consists of but is not limited to: Demolition of the abandoned Water Treatment Plant Building, Field Office Building (including Well House No. 3 Room), 1.0 million gallon potable water ground storage tank and associated booster pump station, and elevated 0.2 million gallon potable water elevated storage tank. Construction of a 3,600 SF Warehouse Building, Booster Pump Station, 2.0 million gallon potable water storage standpipe, and site improvements such as a new roadway, site lighting, parking areas, landscaping and fencing.

Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card needed)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
65 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3044

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20091

Posts: 28325

Administrators: JOHN: 7602, John: 7090

Skip to toolbar