Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
NJ - BOONTON : WELL FIELD 1.0 MG TANK DEMOLITION AND BYPASS MODIFICATION
March 31, 2019
9:08 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

BOONTON : WELL FIELD 1.0 MG TANK DEMOLITION AND BYPASS MODIFICATIONS. The Base Bid Scope of this project includes the demolition, removal and disposal of the existing 1.0 Million Gallon (MG) welded steel water storage tank and appurtenances and removal, disposal and capping of approximately 30 LF of connected piping at the Well Field treatment facility at 136 Old Denville Road within the Town. The Supplemental Scope includes installation of a bypass of the 0.75 MG water storage tank and interconnection between the High Pressure Zone and the Low Pressure Zone. Work is to take place at the Well Field Treatment Facility at 136 Old Denville Road as well as the North Main Street Booster Pump Station at 124 North Main Street within Town

Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
39 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar