ATLANTIC CITY INTERNATIONAL AIRPORT GATE 4 PASSENGER BOARDING BRIDGE REPLACEMENT PROJECT. Major work items include and are not limited to: Removal and disposal of the existing Gate 4 Passenger Boarding Bridge (PBB), excavation and demolition of the existing Gate 4 pile cap, installation of six (6) new timber piles at the existing Gate 4 PBB, construction of a new cast-in-place concrete pile cap, installation of new PBB at Gate 4, removal of striping at Gate 4, installation of new striping at Gate 4.
Details to this bid & hundreds more nationwide at http://www.envirobidnet.com Free 30 Day Trial – 15% discount for DF members if you subscribe (use code D0246 when taking at trial to qualify)
Most Users Ever Online: 429
Currently Online:
114 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950