ALLAMUCHY: Water Storage Tank Replacement. The project consists of installation of one (1) glass fused steel water tank and appurtenances and the removal and disposal of one (1) welded steel water tank. Work includes coordination with the Township for shut-downs, installation of a new section of a water main, removal and disposal of a section of an existing watermain, installation of new tank, disinfection, removal and disposal of existing water tank and restoration. Existing tank must remain in service until new tank is installed and brought into service. Site work including fence work and all electrical and control work are also included.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
67 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950