Sunapee REBID: removal and construction of the Lower Main Street Bridge #094/100, located over the Sugar River The Project generally consists of the removal of existing 26-ft long x 22-ft wide bridge with steel stringers and concrete deck; installation and maintenance of water diversion structures and erosion control measures; construction of a new two-lane longitudinal glue-laminated timber bridge over a 26-ft wide channel; repairing and repointing of existing stone abutments; construction of concrete scour walls, abutment wall caps, and sidewalk abutments; reconstruction of approxi-mately 230 ft. of 22-ft wide paved roadway, slope, and drainage; installation of 150(+/-) ft of timber approach rail, bridge rail, and terminal units; installation of granite curbing; re-establishment of turf, wetlands, and landscaping. Bids due 06/25
Details to this bid & hundreds more nationwide at http://www.envirobidnet.com Free 30 Day Trial – 15% discount for DF members if you subscribe (enter code D0246 when taking at trial to qualify)
Most Users Ever Online: 429
Currently Online:
35 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950