Salem: Site Demolition – Former Waste Water Treatment Facility Planned demolition includes the former Anaerobic Digester Building, Holding Tanks, Trickling Filters and Sedimentation Basins. To complete the project, the work will include, but is not limited to, preparation of certain plans and submittals; mobilization; permits and notifications; site preparation; traffic control; site security; dust, noise, vibration and vermin control; health and safety measures; implementation of demolition facilities, temporary utilities and controls; asbestos removal; polychlorinated biphenyl (PCB) abatement; lead paint abatement; universal waste removal; hazardous materials removal; erosion and sedimentation control; utility termination; demolition of certain structures and site features; off-site waste transportation and disposal; site restoration; final site cleaning; demobilization; and preparation of project records and drawing
Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
132 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090