Z--Demolition of Building 260, Pease ANGB, NH - The work consists of furnishing all labor, plant, materials, and equipment, and performing all work necessary as described below: 1. Demolition of Building 260 five (5) feet below grade 2. Cut and Cap all utilities. (Water, Sewer, Natural Gas, Power) 3. Remove all identified parking/road/driveway in front of building 260 4. Demolition of foundation and concrete slab-on-grade and removal of utilities below slab-on-grade. 5. Demolish three dual fuel boilers 6. Cut and cap all below transmission lines 7. Completely drain HTHW lines 8. Completely remove above ground HTHW transmission lines and concrete support structures 9. Completely remove all valve pits and 10. Site improvements. 11. Turn over all excess granite curbing to the Government. 12. Demolish all storage tanks, fuel transfer lines, and support structures 13. Abate all asbestos on all above ground heat lines and fittings in valve pits.
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
70 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20052
Posts: 28286
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7050