Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
NH - Milton: Complete demolition of three structures
December 2, 2018
8:32 AM
Avatar
Admin
Forum Posts: 7090
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Milton: Complete demolition of three structures located in Milton, NH. Demolition will include but not be limited to the complete demolition, removal and disposal of wood frame structures, debris, interior walls, floors, contents, site debris and garbage and site restoration. Coordination and notifications of adjacent property owners will be required in addition to maintaining safe pedestrian and vehicular traffic in the vicinity of the work site. SCOPE OF WORK: • Perform pre-demolition asbestos containing material survey per NHDES requirements • If any asbestos containing materials are uncovered during the predemolition survey, the Contractor shall submit a change order to remove and properly dispose of those materials.
Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
52 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3044

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20091

Posts: 28325

Administrators: JOHN: 7602, John: 7090

Skip to toolbar