Manchester: Dorrs Pond Dam Rehabilitation. Rehabilitation of Dorrs Pond Dam consists of concrete repairs to deteriorated portions of the concrete spillway, installation of new cut granite curbing for over-topping protection, replacement of existing riprap with new, larger riprap and full grouting, construction of a new concrete wall along the existing dike, and removal of trees within 15 feet of the dam and dike. See attached plans for more details.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
76 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20032
Posts: 28266
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7030