Linderhof Property Owners' Association: Pump Station and Storage Tank project. The Project generally includes site work, concrete work including two new 10,000-gallon concrete atmospheric potable water storage tanks, pump station building installed above storage tanks, plumbing and mechanical work, iron and manganese treatment system, and electrical work including stand by generator and transfer switch. Also included, pipeline connections to site of existing pump station, installation of new gate valves and flush hydrants into the existing distribution system, and demolition of the existing pump station and associated equipment
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
97 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950