Durham: (RFQ) Mill Pond Dam Removal and Oyster River Restoration. The Town of Durham is seeking to prequalify potential contractors for the removal of the Mill Pond Dam and associated restoration of the Oyster River. The prequalification process consists of submitting the Contractor's Prequalification Statement and providing the required additional supporting data to the Town. The project includes the removal of the Mill Pond Dam concrete spillway and fish ladder; excavation, characterization, dewatering, and off-site disposal of sediment deposits; and restoration of the Oyster River channel and floodway incorporating stream-simulation design, channel bank bioengineering, and floodplain plantings. Stream simulation design components include a stone cross-vane (or “riffle crest”), stone J-hooks, boulder features, root wads, log vanes, and coir log banks. As the project consists of in-river work to be completed “in the dry,” it also includes control of water during construction: installation, maintenance, and removal of temporary cofferdams; a flume diversion of the river around the active work area; and work area dewatering and sediment removal.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
98 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19932
Posts: 28166
Administrators: JOHN: 7602, John: 6930