Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
NH - Bristol: old manufacturing building demolition w/hazmat removal
January 8, 2012
5:21 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Demolition of the former Mica building located at 8 Central Street (formerly 5 Central Street) , Bristol, New Hampshire. Work includes, but is not limited to, mobilization, site preparation, traffic control, implementation of temporary facilities and controls, hazardous materials removal, ash removal, soil excavation, erosion and sediment control, utility termination, building demolition, off-site waste/ash/demolition debris/soil disposal, site restoration, implementation of health and safety measures, final site cleaning and demobilization. Bids due 01/25

Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
74 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3034

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19832

Posts: 28066

Administrators: JOHN: 7602, John: 6829

Skip to toolbar