Replacement of the Riverdale Road Bridge over the Middle Branch of the Piscataquog River Town of New Boston. The project consists of replacing a corrugated metal plate (CMP) arch with a new 63&x39; span steel beam bridge. Roadway approach work will be limited to approximately 65&x39; west and 270&39; east of the proposed bridge. The Engineer's estimate for the work is between $950,000 and $1,150,000. C. The anticipated project schedule is to start construction about April 2015 and complete construction about October 2015. Bids due 01/14/15
For details to this bid and hundreds more nationwide see: http://www.envirobidnet.com Take a free 30 day trial (no credit card required)
Most Users Ever Online: 429
Currently Online:
40 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950