demolition of the former Maplehurst Hotel and associated buildings located at 2245 Main Street, Bethlehem, New Hampshire. Work includes, but is not limited to, mobilization, site preparation, traffic control, implementation of temporary facilities and controls, asbestos abatement, hazardous materials removal, soil excavation, erosion and sediment control, utility termination, building demolition, off-site waste / asbestos / demolition debris / soil disposal, monitoring well decommissioning, site restoration, implementation of health and safety measures, final site cleaning, and demobilization. Bids due 04/12
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
53 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20032
Posts: 28266
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7030