[SIZE="4"][FONT="Palatino Linotype"]Get full project details for these and other Demolition bids at http://www.Envirobidnet.com. Sign up for a free 30 day trial today![/FONT][/SIZE]
[FONT="Palatino Linotype"]AL Bridge Replacement/Demolition hereinafter described. The work of constructing said improvements will be let under one Contract, the principal items of work are
CA Fontana - Demolition Services
CA Newark - BANK BUILDING DEMOLITION (6128 THORNTON AVENUE) The improvements are generally described as follows:Provide labor, equipment, materials and services
CA Ripley - Constructing RIPLEY FARM WORKER HOUSING REHABILITATION RIPLEY, CALIFORNIA. The Work comprises of the following: The work of this Contract shall consis
CA Petaluma-Sonoma Marin Area Rail Transit Trestle Bridge Demolition.
CA **FEDERAL BID** Removal of Old Camp Nine Bridge, New Melones Lake
CA Monterey - Abatement Contractor (MPC) seeks a qualified hazardous material abatement contractor to handle a an abatement and demolition contract at one of the
CA REEDLEY - For constructing Wastewater Treatment Plant 5 MGD Expansion. The Work consists of construction of the expansion and upgrade of the Reedley Wastewater
CO Abatement/Demolition at Hirschfeld Towers
CT Demolish and remove the entire structure less the cement foundation. 2. Demolish and load entire structure, less foundation, into dumpsters provided by the Town
CT Provide design and construction services for a 7,271 SF faculty office building to replace Temporary Building (TE-5). This project is Phase 1 of a two phase pro
CT demolition of the playground at the P.T. Barnum Apartments, 96 Bird Street, Bridgeport, CT 06605
CT Christopher Columbus Pre K -8 School is a complete demolition and reconstruction of 24 million dollar, 80,000 sq ft New Haven elementary school. The new school
FL VARIOUS RESIDENTIAL DEMOLITION PROJECTS
FL SWFAS is accepting bids for demolition of a single family home located at 2542 Grand Ave., Fort Myers, FL, new construction of a three bedroom two bath duplex (
FL DEMOLITION OF COMMERCIAL AND SINGLE FAMILY DWELLINGS - ORTIZ AVENUE SCOPE OF WORK: Demolition of commercial and single family dwellings, both conventional buil
FL Rehabilitation of one (1) single family home and the demolition and replacement of two (2) single family homes located in the City of Clewiston as a part of the
FL South Gate Complex
Most Users Ever Online: 429
Currently Online:
121 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20032
Posts: 28266
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7030