Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
New Demolition Bids Week of 09/18/06
September 17, 2006
6:27 PM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

[SIZE="4"]Get full project details for these and other Demolition bids at http://www.Envirobidnet.com. Sign up for a free 30 day trial today![/SIZE]

AL GOVERNMENT CENTER ANNEX DEMOLITION PACKAGE

AR DEMOLITION OF ALL BUILDINGS WITH MINOR SITE RENOVATION located within the

AR Demolition and removal of three buildings at the

AR Site Grading and Vault Relocation - The work involves, but is not limited to, the following: Removal of existing electrical vault building, construction of a

CA Riverside - Building Demolition and Lot Clearing

DE BUILDING DECONSTRUCTION PROJECT

FL DEMOLITION AND NEW CONSTRUCTION - demolition and construction of new dwelling units on behalf of the following owners of the following units: Unit No. 01-35, So

FL Demolition of Building No. 1 and removal of miscellaneous site items

FL Demolition Concession Stand -Bids are invited upon the items and quantities of work as follows: Demolish existing two-story concession stand bu

FL Earthwork, Demolition, and Site Prep for Phase II

IL Demolition and clearing of the buildings, foundation, garage, and all debris from the premises

IN site demolition and removal of scrap from a 131 ft. high, 75 thousand gallon, and 5-stand water tower

IN site demolition and removal of scrap from a 131 ft. high, 75 thousand gallon, and 5-stand water tower coated with lead based paint. Cost for restoration of this

KS Demolition of the old city hall bldg. located

LA Demolish and Remove Navy Hangar Approx. 56,000 SF

MA POND DAM IMPROVEMENTS PROJECT The project consists of work as follows: Auburn Pond Dam - Demolition of existing structures, water

MA Study, Design and Implementation of Various Demolition Projects

MA DEMOLITION OF WALNUT ST CITY

MA DEMOLITION OF 24 ALLYN ST CITY

MA Rivermoor BPL & City Archives Demolition

MD Replacement of Bridge No. 3207 on Freeland Road over I-83. The new bridge will be a two span steel girder bridge with a length of 212

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
72 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar