Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
New Demolition Bids Week of 08/07/06
August 7, 2006
8:44 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Get full project details for these and other Demolition bids at http://www.Envirobidnet.com. Sign up for a free 30 day trial today!

AL Demolition of Abandoned Houses

AR Backbone Ridge Tank and Pump Station for the Searcy Board of Public Utilities

CA **FEDERAL BID** Destroy Five (5) Abandoned Vertical Water Wells-Description Project consists of properly destroying five (5) abandoned wells at four (4) projec

CA DEMOLITION OF SHERMAN ELEMENTARY SHCOOL.

CA LOWTREE NEIGHBORHOOD BUILDINGS DEMOLITION NO. 2

CA BUILDING DEMOLITION AT 450 NORTH BALDWIN PARK BOULEVARD CONTRACT NO.BB-0346 The scope of work is as follows: Provide all labor,

CA Demolition and Clean-Up located at 149 San Antonio Road.

CA Richman Property Demolition

CA **FEDERAL BID** Demolish Quarters and Garage at Cape Arago Light Charleston, Oregon, CA

CO **FEDERAL BID** ESTES PARK, CO; REMOVE AND REPLACE WATER TANK-Description This proposed procurement consists of the demolition of an existing 12ft diameter by

CT Abatement/Demolition The work consists of the complete abatement and interior demolition, including the elevators and mechanical and electrical systems of the f

CT MIDDLETOWN HIGH SCHOOL AND VOCATIONAL AGRICULTURAL CENTER The Project consists of providing all labor, material, equipment, and services required to complete

CT MODIFICATIONS TO PROSPECT RESERVOIR DAM The Project includes furnishing all labor, tools, materials and equipment necessary to complete the modifications to th

CT demolition of a 2400 square foot barn at 15 Sugarloaf Cut for the Town of Simsbury Public Works Department-Building & Grounds Division.

CT Building, Architectural, Mechanical, Electrical AT TROUP SCHOOL BP 3.3 - Concrete Work BP 3.4 - Masonry BP 3.5 - Structural and Misc. Steel BP

DE Phase II - Water Tower Removal, Project involves dismantling and removal of the existing elevated water storage tank, to include removal and disposal along with

FL Demolition of the Heritage Oaks Residential Complex located at Henry Street and Heritage Circle in Punta Gorda. The project consists of demolition of all above

FL DEMOLITION of the

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
75 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19932

Posts: 28166

Administrators: JOHN: 7602, John: 6930

Skip to toolbar