[SIZE="4"][FONT="Palatino Linotype"]Get full project details for these and other Demolition bids at http://www.Envirobidnet.com. Sign up for a free 30 day trial today![/FONT][/SIZE]
CA Riverside - Demolition, Asbestos Removal, Trash & Debris Clean-up.
CA Riverside - Building Demolition and Lot Clearing 4029 Mission Inn Ave.Site clearing, debris removal, building demolition and removal, foundation removal, asphalt
CA Oakland - DEMOLITION OF BUILDING 640 AT THE FORMER OAKLAND ARMY BASE OUTER HARBOR OAKLAND, CALIFORNIA.The work of this one hundred eighty (180) calendar day p
CA Victorville - Abestos Abatement and Building Demolition
CA San Diego -SOUTH CAMPUS DEMOLITION PHASE 3-ABC CHULA VISTA, CALIFORNIA All work necessary to dismantle fifteen (15) buildings; remediate hazardous materials;
CA Sacramento - Demolition of 802 K Street .Demolish a single-story, masonry and wood-framed commercial structure with a full basement, approximately 7,000 square
CA Walnut Creek - LAR RIEU PROPERTY SWIMMING POOL REMOVAL AT 196 EL CAMINO CORTO. The project consists of, but not limited to, performing the following work: - Rem
CA CAYUCOS ELEMENTARY SCHOOL BUILDING DEMOLITION AND ASBESTOS ABATEMENT 301 CAYUCOS DRIVE, CAYUCOS, CA 93430 - General Work Description. Demolition of existing bui
CA San Diego - FORMER NAVY PIER REHABILITATION SAN DIEGO, CALIFORNIA The Work includes demolition, removal, repair and reconstruction of concrete deck; construct
CO Breckenridge Sanitation District Farmers Korner Wastewater Treatment Facilities Centrifuge and MCC-4 Replacement Project You are invited to bid on work c
CO Description: Demolishment of Vacated Buildings
CT Building Demolition hazardous waste abatement for property located 262 Main St., Terryville, CT.
CT Demolition of the existing community center at Colonial Village Apartments in Norwalk, CT.
DE Reconstruction of Wharf Unit 2, Berth 4 project at the Port of Wilmington, Wilmington, Delaware. This project consists of all demolition, dredging, civil, site
DE UNDERGROUND STORAGE TANK (UST) REMOVAL, ABANDONMENT and OVEREXCAVATION CONTRACT remove or abandon USTs, and conduct overexcavation services, at state-lead
DE Reconstruction of Wharf Unit 2, Berth 4 project at the Port of Wilmington, Wilmington, Delaware. This project consists of all demolition, dredging, civil, site
FL Interior Demolition at 328 Jefferson Avenue, Miami Beach, Florida
FL Demolition and/or sale and removal of the following: FM #: 258398 1 COUNTY: Hillsborough PARCEL: 364 LOCATION: 4006 Nassau Street (A single family residence app
FL DEMOLITION AND RELATED SITE CLEARANCE
GA Container Berth Eight - Phase 2 Demolition & Earthwork.The proposed work consists of rough grading operations and subgrade preparations within an approximately
GA Rehabilitation of Pump Station No. 2.This includes approximately 1,550 LF of 12" forcemain, the demolition of an existing pump station and the construction of a
IL Demolition of 521 College Avenue: This is Single-Family Residence not a commercial property
IL Structural Demolition/Recycling Future Kankakee City Hall Building 304 S. Indiana Ave.Kankakee, IL 60901
IL Demolition and removal of the existing fire damaged pre-engineered metal bus garage building located at 707 NE 3rd Street in Casey, Illinois. A Schedule of Work
IL DEMOLITION of certain real property commonly known as 1913, 1915 and 1917 Sheridan Road, Zion, Illinois, 2902 Gideon Avenue, Zion, Illinois, and 40488 N. Lydia
IL Commercial Demolition Project at 110-116 N. Main Street, Creve Coeur, Illinois
IN DEMOLISH on the Indiana University. Bloomington campus, in accordance with plans and specifications prepared by the University Architect
Most Users Ever Online: 429
Currently Online:
92 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20032
Posts: 28266
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7030