Hall County Airport Authority: construction of the Central Nebraska Regional Airport Passenger Terminal project but is not limited to the construction of approximately 34,000 square feet building constructed in three phases. The Work includes building demolition, building construction including excavation, earthmoving, selective demolition, limited landscaping and site utility work, concrete work, glulam and steel frame construction, carpentry, masonry, metals, aluminum storefront windows, aluminum and hollow metal doors, hollow metal frames, finished hardware, millwork, interior finishes including wall and floor tile, terrazzo, and carpeting, furniture, plumbing, fire protection, mechanical (including geothermal), electrical, network communication, security, life safety, and baggage handling systems, limited landscaping, and signage. Bids due 06/26
For details to this bid and hundreds more nationwide go to http://www.envirobidnet.com and try a Free 30 Day Trial
Most Users Ever Online: 429
Currently Online:
80 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950