Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
NE - Hall County: Airport renewal project demolition
June 1, 2014
8:04 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Hall County Airport Authority: construction of the Central Nebraska Regional Airport Passenger Terminal project but is not limited to the construction of approximately 34,000 square feet building constructed in three phases. The Work includes building demolition, building construction including excavation, earthmoving, selective demolition, limited landscaping and site utility work, concrete work, glulam and steel frame construction, carpentry, masonry, metals, aluminum storefront windows, aluminum and hollow metal doors, hollow metal frames, finished hardware, millwork, interior finishes including wall and floor tile, terrazzo, and carpeting, furniture, plumbing, fire protection, mechanical (including geothermal), electrical, network communication, security, life safety, and baggage handling systems, limited landscaping, and signage. Bids due 06/26

For details to this bid and hundreds more nationwide go to http://www.envirobidnet.com and try a Free 30 Day Trial

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
80 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar