Winston-Salem: Union Station Phase 1 – Grading and Demolition; Project Description: Site Work: Removal of existing concrete façade wall, removal of portions of existing chain link fencing, removal of dirt and debris from atop historic site elements such as concrete sidewalks/platforms/stairs and brick paving, removal of portions of concrete platform, removal of asphalt ramping at entrances, grading, installation of erosion control measures, installation of temporary sediment skimmer basins, installation of gravel construction entrances, installation of temporary check dam, installation of temporary inlet protection devices, installation of temporary silt fences. Exterior Renovations: Removal of chain link fencing at site stair and windows, removal of exterior electrical fixtures and wiring, removal of exterior mounted gas piping and meter, removal of exterior surface mounted telephone and cable boxes and wiring, removal of debris from lightwells, removal of exterior surface mounting piping and asbestos insulation. Interior Renovations: removal of linoleum flooring, cleaning of historic interior flooring such as terrazzo and tile, cleaning of historic interior wall and ceiling plaster, cleaning of historic interior marble wainscot and door/window surrounds, removal of plumbing fixtures, removal of steam radiators and piping, removal of ductwork, selective demolition of interior hollow tile and plaster walls, salvaging of doors and door hardware for reuse, cleaning of concrete flooring, bird excrement abatement, removal of existing kitchen equipment, removal of metal toilet partitions, selective demolition of interior brick walls, removal of interior overhead doors, selective demolition of concrete slab on grade for elevator pit, saw cutting of concrete to expose base of steel columns, removal of existing paint booth, removal of existing fire protection piping and risers, removal of existing rainwater piping and risers, removal of existing sewer piping and risers, removal of existing water piping and risers, removal of existing fuel storage tank and surrounding sand fill, removal of existing concrete boiler pad, removal of existing garbage burner and concrete pad, removal of existing blow-off tank and concrete pad, removal of existing gas furnace, asbestos abatement on ducts and piping, asbestos abatement on tanks and equipment
Details to this demo bid & hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card needed)
Most Users Ever Online: 429
Currently Online:
31 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950