REPLACE BRIDGE NO. 95 ON SR 1715 (ELLENWOOD ROAD) OVER BRUSHY FORK CREEK; This work shall consist of furnishing and installing a prestressed concrete box beam structure, removal of the existing structure; clearing and grubbing; comprehensive grading; installation of guardrail; roadway base course and pavement; placement of substructure and superstructure; grading within limits of the project; placement of rip rap; temporary erosion control; seeding and mulching; drainage; temporary work zone devices and signing; and all other incidental items necessary to complete the project Bids due 038/19
Details to this bid & hundreds more nationwide at,. http://www.envirobidnet.com Free 30 Day Trial – 15% discount for DF members if you subscribe (use code D0246 when taking a trial to qualify)
Most Users Ever Online: 429
Currently Online:
100 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950