Marion: Demolition of Former Drexel Facility: The Project consists of the following major items: Removal of four (4) existing fuel oil underground storage tanks (USTs) and One (1) existing oil-water separator (OWS), remove soil contaminated by release from USTs and/or OWS and Backfill excavation. Abatement of asbestos containing material (ACM) found at the site. Demolition and debris removal of multiple former mill buildings currently in various states of demolition at the site. Construction of stabile slopes to protect adjacent property potentially impacted by demolition of existing structures