FAYETTEVILLE METROPOLITAN HOUSING AUTHORITY: 108 Wiley Street Building and Site Demolition Project. Scope of work will consist of, but is not limited to, the following items: 1. Complete demolition and removal of existing 15,477+/- commercial building, 3,000 SF +/- storage structure, 1,104+/- residential structure and existing site improvements, utilities and vegetation. 2. Provide erosion control measures, site improvements, and utility capping. 3. All other work as shown on plans, in the specifications and as required by codes
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
65 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950