Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
NC - Charlotte, student residence hall demolition
August 21, 2011
5:52 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

(LOI) Student Housing Demolition Phase II - Martin Village. The project is for the demolition of the Residence Hall Phase II - Martin Village. The Martin Village complex consists of 10 individual two story units withapproximately 6,230 sq. ft. per unit. In the schematic design development phases of this project, the designer must determine which materials in the Residence Hall units can be recycled through the State Construction guidelines. In addition, the designer will need to review the existing underground as-built infrastructure to determine what utilities will be required from this existing infrastructure to support the other Residence Hall Units in the adjacent areas. Project Budget : $ 665,000

Find complete details to this bid and more nationwide at envirobidnet.com click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
123 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19932

Posts: 28166

Administrators: JOHN: 7602, John: 6930

Skip to toolbar