Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
NC - Charlotte Douglas Itnl Airport: Wilson Air Center North Terminal Early Site Package
October 14, 2018
10:04 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Charlotte: Charlotte Douglas International Airport: Wilson Air Center North Terminal Early Site Package: The Early Site Package project consists of Work required to ready the site for the future Wilson Air Center North Terminal and other Work indicated in the Contract Documents: Hazardous material abatement in the existing North Terminal Building. Structure demolition of the existing North Terminal Building. Site demolition of existing elements including curb & gutter, asphalt & concrete paving, sidewalks, fencing, grubbing landscaping, utilities & storm drainage systems in the project Work area as shown on the Civil Drawings and other Work indicated in the Contract Documents

Complete details for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
79 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar