Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
NC - Charlotte: Ashe Plantation – Phase II Upgrades. The Project consists of the demolition of the existing 0.1 MGD
October 13, 2024
8:46 AM
Avatar
Admin
Forum Posts: 7110
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

Charlotte: Ashe Plantation – Phase II Upgrades. The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation.

Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
187 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3046

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20111

Posts: 28345

Administrators: JOHN: 7602, John: 7110

Skip to toolbar