Charlotte: Ashe Plantation – Phase II Upgrades. The Project consists of the demolition of the existing 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration, clarifiers), filters, generator, shed and select yard piping. The new infrastructure includes a new 0.1 MGD “packaged” WWTP (flow eq, sludge holding, extended aeration), two clarifiers, pre-engineered office/lab building, generator and the associated yard piping, site work, electrical and instrumentation.
Get details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE THIRTY DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
187 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3046
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20111
Posts: 28345
Newest Members:
Natalie Francis, Winwin, Green, NORMAN MICHAEL ARTHUR, DougAdministrators: JOHN: 7602, John: 7110