Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
NC - BOONE: 11 story university building demolition
January 13, 2014
10:15 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

WINKLER HALL DEMOLITION; The project includes demolition and complete removal of an eleven story building with about 68,000 square feet. Winkler Hall has a steel frame, concrete floors, CMU and sheetrock interior walls and brick veneer. Asbestos abatement will be completed separately and is not included in this scope. Use of explosives and implosion are acceptable. Primary on-site work is expected to begin in April/ May, 2014 and to be completed in August, 2014. Work will be performed under a Single Prime General Construction Contract. To qualify, the contractor must have an Unlimited General Contractor's license in the State of North Carolina as well as applicable bonding requirements. The contractor must have completed, within the last ten years, three projects similar in scope with a value exceeding three hundred thousand dollars. Evidence of completion of high-rise projects is also required Bids due 01/21

Find details to this bid and more you may be missing nationwide at envirobidnet.com (click below) try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
81 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar