Asheville Middle School project BP100-General Trades; BP105-Final Cleaning; BP202-Turnkey Sitework; BP204-Asbestos Abatement & Demolition; BP225-Concrete Paving & Sidewalks; BP290-Landscaping; BP300-Turnkey Building Concrete; BP400-Turnkey Masonry; BP500-Structural & Misc Steel; BP740-Roofing; BP750-Metal Wall Panels/Perforated Screen Panels; BP790-Caulking & Waterproofing; BP800-Doors, Frames, Hardware; BP840-Aluminum Entrances/ Storefront/ Curtainwall; BP845-Translucent Wall Panels; BP925-Metal Framing/ Drywall/ Insulation; BP930-Hard Tile; BP960-Carpet/Resilient Flooring/Base; BP965-Wood Flooring; BP980-Acoustical Ceiling Systems; BP990-Painting. Bids due 07/08
For details to this bid and hundreds more nationwide go to, http://www.envirobidnet.com - Take a free 30 Day Trial (no cc needed)
Most Users Ever Online: 429
Currently Online:
67 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950