Greenville: Imperial Warehouse Demolition, Atlantic Avenue: Provide labor, equipment and material to remove ALL non-earth content from designated parcels parallel to Atlantic Avenue. This includes steel structures, concrete pads, pavement, retaining walls, footings, columns, brick, wood, mortar and any other constructed related materials. Site shall be leveled and graded to slope to the north and west of parcel for drainage with remaining on-site earth material that is left. Any underground utilities (UGU) found during demolition will be chased to city right of way and properly secured.Erosion control must be placed around demolition site.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
60 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950