BARRETTS BRIDGE REPLACEMENT. Barretts Diversion Dam Recreation Area, East Bench Unit, Three Forks Division, Pick-Sloan Missouri Basin Program, Montana. The principal components of work to be performed under these specifications include the following: Design, furnish and place precast prestressed bulb tee bridge beams or structural steel girders with reinforced concrete deck; Furnish and drive piles for abutments; Place new reinforced cast-in-place pile cap and abutments; Earthwork for constructing road embankment, and compacted fill about the new structure; Furnish and place gravels for roadway surfacing and waterway protection; Furnish and install bridge guardrail; Remove and dispose of the existing bridge, abutments and center pier; Furnish and install highway signage and gate. Bids due 03/01
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
77 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950