Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MT - Three Forks: bridge demolition
February 3, 2013
6:10 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

BARRETTS BRIDGE REPLACEMENT. Barretts Diversion Dam Recreation Area, East Bench Unit, Three Forks Division, Pick-Sloan Missouri Basin Program, Montana. The principal components of work to be performed under these specifications include the following: Design, furnish and place precast prestressed bulb tee bridge beams or structural steel girders with reinforced concrete deck; Furnish and drive piles for abutments; Place new reinforced cast-in-place pile cap and abutments; Earthwork for constructing road embankment, and compacted fill about the new structure; Furnish and place gravels for roadway surfacing and waterway protection; Furnish and install bridge guardrail; Remove and dispose of the existing bridge, abutments and center pier; Furnish and install highway signage and gate. Bids due 03/01

Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
77 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar