Bridge Replacement - CR 127. Major work involved in the project consists of the following approximate quantities: BASE BID: I LS Mobilization, Taxes, Insurance, Bonds; 1 LS Structure Removal, 1 LS Structure Excavation Type I, 53 CY Concrete Class DD, 6537 Lbs Reinforcing Steel, 644 SY Random Riprap, 393 LF Prestressed Beam - Tri-Deck, 1020 LF Furnish Steel Pile HP 10x42, 1020 LF Drive Steel Pile HP 10x42, 131 LF Bridge Railing - Concrete Barrier, 350 Ton Crushed Surface Course (6" depth), 1650 Ton Uncrushed Subbase Gravel, 500 CY Roadway Excavation, 1600 SY Geotextile Fabric, 1025 SY Sub-grade Preparation, 100 Ton Transition/Approach Gravel, 1 LS Temporary Highway Striping, 1 LS Traffic Control, 1 LS Seeding, 5000 EA Miscellaneous Work, 5000 EA Testing Laboratory Services; and all miscellaneous work necessary therefore and incidental thereto for a complete project Bids due 01/27
Find details to this bid and more you may be missing nationwide at envirobidnet.com (click below) try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
83 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950