Construction of the Black Lane Bridge Replacement Project. The work includes replacement of the existing bridge structure at the location described below. Replacement shall include cast in place concrete spread footings superstructure with precast concrete deck. Work shall also include excavation and compaction, riprap slope protection, bridge barrier, guardrail installation, and related work. The project site is located within Ravalli County, approximately two miles southwest of the town of Corvallis, MT. The site is located just east of the intersection of Old Corvallis Road and Black Lane. All work must be substantially complete by April 10, 2013 Bids due 01/25
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
80 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950