Carroll Trail Bridge Removal over Beaver Creek and Stone Barn Lane Bridge Removal over Rock Creek. The project consists of: Carroll Trail Bridge: The construction of a new 50-ft single span bridge on Carroll Trail over Beaver Creek, located about 9.0 miles southwest of Lewistown, Montana. Improvements consist of, but are not limited to, removal and disposal of the existing timber bridge, removal of the existing detour, substructure construction, superstructure placement, placement of select backfill, hauling and placing riprap and construction of roadway approaches after the new bridge is complete. The substructure will consist of driven steel piles and prefabricated steel abutments.
McCollum Bridge Removal over Cottonwood Creek and Apples Bridge Removal over Cottonwood Creek. The project consists of: McCollum Bridge: The construction of a new 62-ft single span bridge on Cottonwood Creek Road over Cottonwood Creek, located about 7.5 miles southwest of Lewistown, Montana. Improvements consist of, but are not limited to, removal and disposal of the existing culvert, substructure construction, superstructure placement, placement of select backfill, hauling and placing riprap and construction of roadway approaches after the new bridge is complete. The substructure will consist of driven steel piles and prefabricated steel abutments. Bids due 10/17
Find complete details to this bid and more nationwide at http://www.envirobidnet.com or click on link below - try a FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
44 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3042
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20032
Posts: 28266
Newest Members:
Doug, David Groves, David Groves, Arthur Smiths, BUTRUS WOLAdministrators: JOHN: 7602, John: 7030