Construction of the Bozeman Hyalite Sourdough Water Treatment Plant Replacement . The project generally consists of, but is not necessarily limited to, the following major items: Demolition of the existing water treatment plant and corrosion control buildings following successful startup of the new replacement Water Treatment Plant (WTP) facilities, construction of a new residuals storage lagoon, construction of new residuals drying beds, construction of a new on-site sewage treatment system, construction of a new intake structure and intake facility for the existing Sourdough Creek raw water source intake, construction of a new expansion to the facility flow control building, construction of a raw 42,000 square foot water treatment building that houses administration, maintenance, chemical storage, membrane treatment, maintenance, laboratory and preliminary treatment areas, installation of Owner furnished membrane treatment at a capacity of 22 mgd, and construction of all associated mechanical, electrical, instrumentation and control and general sitework items. Bids due 06/07
Find complete details to this bid and more nationwide at envirobidnet.com click on link below FREE 30 DAY TRIAL
Most Users Ever Online: 429
Currently Online:
97 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19932
Posts: 28166
Administrators: JOHN: 7602, John: 6930