Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MT - BILLINGS: AIRPORT IMPROVEMENTS, BILLINGS LOGAN INTERNATIONAL AIRPORT
March 15, 2020
9:02 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

BILLINGS: AIRPORT IMPROVEMENTS, BILLINGS LOGAN INTERNATIONAL AIRPORT.Construction of “Terminal Expansion - Phase(s) 2-5” to include the following:Terminal Expansion - Phase(2) 2-5 for scopes Sitework, Site Utilities, Abatement, Building Demolition, Concrete, Structural Steel, Cabinetry/Countertops, Insulations, Metal Siding and Soffit, Doors and Hardware, Overhead Coiling Grilles, Sectional Overhead Doors, Steel Stud Framing and Drywall, Taping and Painting, Ceramic Tiling, ACT Ceilings, Resilient and Carpet Flooring and Base, Specialties, Fire Suppression, Plumbing Complete, HVAC Systems, Electrical.

Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
89 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar