BILLINGS: AIRPORT IMPROVEMENTS, BILLINGS LOGAN INTERNATIONAL AIRPORT.Construction of “Terminal Expansion - Phase(s) 2-5” to include the following:Terminal Expansion - Phase(2) 2-5 for scopes Sitework, Site Utilities, Abatement, Building Demolition, Concrete, Structural Steel, Cabinetry/Countertops, Insulations, Metal Siding and Soffit, Doors and Hardware, Overhead Coiling Grilles, Sectional Overhead Doors, Steel Stud Framing and Drywall, Taping and Painting, Ceramic Tiling, ACT Ceilings, Resilient and Carpet Flooring and Base, Specialties, Fire Suppression, Plumbing Complete, HVAC Systems, Electrical.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
89 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950