Mississippi Soil and Water Conservation Commission: REMOVAL AND REPLACEMENT OF SKUNA WATERSHED STRUCTURE NO. 6. The project includes clearing and grubbing; structure removal; protective cover; erosion control blanket; mobilization and demobilization; removal of water; excavation: earth fill; drain fill; concrete, class 3000M; 4� diameter plc. pipe schedule 40, perforated; 4' diameter pvc pipe schedule 40; 48' corrugated metal pipe-barrels; 60' corrugated metal pipe � risers; rock rip rap; geotextile material and concrete grout.
Details to this bid and hundreds more nationwide at http://www.envirobidnet.com – take a 30 DAY FREE TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
89 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3044
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 20091
Posts: 28325
Newest Members:
Green, NORMAN MICHAEL ARTHUR, Doug, David Groves, David GrovesAdministrators: JOHN: 7602, John: 7090