The project includes the demolition of a nearly 175,000 S.F. metal building known as Warehouse E & F, The intent of the project is to demolish the warehouse completely, leaving the concrete foundation in place and undisturbed. The existing rail system will also remain. Work shall include, but not be limited to, the removal of the warehouse walls, roof and structure complete down to the slab; including the perimeter concrete walls and interior concrete pilasters, all electrical and fire protection. The security system will be removed by Owner prior to start of work. All materials shall be removed from site and properly disposed of. Bids due 12/15
For details to this bid and hundreds more nationwide see: http://www.envirobidnet.com Take a free 30 day trial (no credit card required)
Most Users Ever Online: 429
Currently Online:
85 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950