Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MO - Student Housing Demolition project
November 30, 2014
7:34 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Columbia: Demolition of an existing student housing building Dobbs Group Replacement Project Phase 1. This project consists of two, five level student housing buildings of approximately 200,000 sf with 572 beds. The scope includes demolition of an existing student housing building, utility relocations, associated sitework, basement excavation, concrete, steel fabrication & erection, masonry, carpentry & casework, shingle and membrane roofing, metal panels, EIFS, load bearing stud framing, drywall, interior finishes and MEPFP work. SUBMIT TO: Bids for this project are due on December 12, 2014 and should be delivered to Paric via e-mail (bids@paric.com) or fax (636-561-9501). Bids due 12/12

For details to this bid and hundreds more nationwide see: http://www.envirobidnet.com Take a free 30 day trial (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
80 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar