Columbia: Demolition of an existing student housing building Dobbs Group Replacement Project Phase 1. This project consists of two, five level student housing buildings of approximately 200,000 sf with 572 beds. The scope includes demolition of an existing student housing building, utility relocations, associated sitework, basement excavation, concrete, steel fabrication & erection, masonry, carpentry & casework, shingle and membrane roofing, metal panels, EIFS, load bearing stud framing, drywall, interior finishes and MEPFP work. SUBMIT TO: Bids for this project are due on December 12, 2014 and should be delivered to Paric via e-mail (bids@paric.com) or fax (636-561-9501). Bids due 12/12
For details to this bid and hundreds more nationwide see: http://www.envirobidnet.com Take a free 30 day trial (no credit card required)
Most Users Ever Online: 429
Currently Online:
80 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950