Municipal River Terminal South Dock Reconstruction Project. Prices are being solicited for the following: Material Testing, Quality Control, Reinforcing Steel Erection, Concrete Construction, Structural Steel Erection, Excavation, Sewers and Drainage, Rock Anchors, Surveying, Demolition, Ready Mix Concrete, Structural Steel Fabrication, Electrical Work, Hauling and Trucking, Concrete Paving, Sheet Piling and Pile Driving. All subcontractors and suppliers must be certified by the City of St. Louis Lambert International Airport Authority Directory Bids due 12/09
Find details to this bid and more nationwide at envirobidnet.com FREE 30 DAY TRIAL click on link below
Most Users Ever Online: 429
Currently Online: John
35 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19932
Posts: 28166
Administrators: JOHN: 7602, John: 6930