Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MO - Duck Creek, levee demolition
April 10, 2011
1:45 PM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Duck Creek C.A. Golden Anniversary Wetland Unit A & Unit B Renovation. The project consists of the demolition of existing levee systems and filling of the borrow ditches, demolition of existing concrete duck blinds, pipes, and concrete/steel water control structures; construction of new low profile levee system using material from the old levee system, from new ditches and borrow areas; new concrete water control structures with the appropriate sized PVC pipes; refurbishing 4 existing wells with new distribution piping and upgrading the electrical systems; and construction of a new well (#5) with the required equipment, and piping. Bids due 05/04

Find complete details to this bid and more nationwide at envirobidnet.com FREE 30 DAY TRIAL click on link below (special discount available to forum members)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
94 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3042

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 20032

Posts: 28266

Administrators: JOHN: 7602, John: 7030

Skip to toolbar