Duck Creek C.A. Golden Anniversary Wetland Unit A & Unit B Renovation. The project consists of the demolition of existing levee systems and filling of the borrow ditches, demolition of existing concrete duck blinds, pipes, and concrete/steel water control structures; construction of new low profile levee system using material from the old levee system, from new ditches and borrow areas; new concrete water control structures with the appropriate sized PVC pipes; refurbishing 4 existing wells with new distribution piping and upgrading the electrical systems; and construction of a new well (#5) with the required equipment, and piping. Bids due 05/04
Find complete details to this bid and more nationwide at envirobidnet.com FREE 30 DAY TRIAL click on link below (special discount available to forum members)
Most Users Ever Online: 429
Currently Online:
78 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19932
Posts: 28166
Administrators: JOHN: 7602, John: 6930