Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MO DOT: Demolish an existing weigh scale building and site
April 8, 2018
9:04 AM
Avatar
Admin
Forum Posts: 6950
Member Since:
May 12, 2010
sp_UserOfflineSmall Offline

MO DOT: Demolish an existing weigh scale building, septic tank, scale, inspection station, curbing and miscellaneous items throughout the Watson Northbound Weigh Scale on I-29, mile marker 121.4. Interested parties will be responsible for removing the structures to two feet below finished grade and disposing of said structures/materials in a proper manner (landfill or salvaging the material). MoDOT shall pump out septic tank. Contractor shall break the bottom of septic tank in such a manner to allow drainage and walls shall be collapsed. Contractor shall grade lot for positive drainage and place a minimum of 6 inches of 1 inch minus rock across the entire lot with the exception of driving areas currently paved with concrete. Asbestos Abatement will be part of this project.

Detailed information for this bid and hundreds more nationwide at http://www.envirobidnet.com, FREE 30 DAY TRIAL (no credit card required)

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
57 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar