Red Lake Band of Chippewa Indians: Structure Demolition, Removal and Cleanup. For the demolition, removal and cleanup of four structures in Red Lake. The expected date of completion of all aspects of this project is October 31, 2021. demolishing two concrete buildings, identified as Buildings 38 and 40, as well as two steel structures, identified as Buildings 41 and 82. Demolition must be completed in such a manner as to limit residual environmental impact to the surrounding area. The resulting debris will be removed to a landfill, and the property will be appropriately cleaned of all nails, concrete, wood, glass, steel and other demolition related debris. Additionally, fill will be provided by the contractor to achieve a level surface upon completion. Building 38 (concrete) - Pump House 124 sq. ft. Building 40 (concrete) - Storage (non-heated) 928 sq. ft. Building 41 (steel) - Storage (non-heated) 144 sq. ft. Building 82 (steel)) - Utility Plant - Water Treatment 857 sq.
Details and contact info for this bid and hundreds more nationwide at http://www.envirobidnet.com FREE 30 DAY TRIAL (no credit card required)
Most Users Ever Online: 429
Currently Online:
133 Guest(s)
Currently Browsing this Page:
1 Guest(s)
Member Stats:
Guest Posters: 54
Members: 3039
Moderators: 0
Admins: 2
Forum Stats:
Groups: 4
Forums: 17
Topics: 19952
Posts: 28186
Administrators: JOHN: 7602, John: 6950