Avatar

Please consider registering
guest

sp_LogInOut Log In sp_Registration Register sp_MemberList Members

Register | Lost password?
Advanced Search

— Forum Scope —





 

— Match —





— Forum Options —





Minimum search word length is 3 characters - maximum search word length is 84 characters

sp_Feed Topic RSS sp_TopicIcon
MN - Red Lake: 50 X 192' Admin Building Demolition
March 2, 2014
9:54 AM
Avatar
NATIONWIDE
Admin
Forum Posts: 7602
Member Since:
June 8, 2006
sp_UserOfflineSmall Offline

Red Lake Schools #38: Demolition of the Former Administration Building. demolish the former district office building. The building dimensions are 50' wide by 192' long. The structure is single story wood construction with a crawl space under half the building and slab on grade in the other half. The winning bidder will be responsible for 1.Removing the entire building, stoops, sidewalks, foundations, concrete slabs and footings. 2.Establishing proper drainage from the existing school and reestablishing grass. 3.Properly abandoning sewer, water and electrical. 4.Providing means and methods for controlling dust and keeping the site safe from public access during demolition The structure does not contain asbestos or lead paint Bids due 03/12

Find details to this bid and more you may be missing nationwide at envirobidnet.com (click below) try a FREE 30 DAY TRIAL

Forum Timezone: America/New_York

Most Users Ever Online: 429

Currently Online:
74 Guest(s)

Currently Browsing this Page:
1 Guest(s)

Top Posters:

James: 5298

demobud: 817

Robert Kulinski: 573

1Pyro: 548

autoparter: 534

Member Stats:

Guest Posters: 54

Members: 3039

Moderators: 0

Admins: 2

Forum Stats:

Groups: 4

Forums: 17

Topics: 19952

Posts: 28186

Administrators: JOHN: 7602, John: 6950

Skip to toolbar